What Risks Will Happen If You Delay Exchanging the Worn Tundish Nozzle?
Sep 23, 2026
Tundish nozzle is a critical refractory component for continuous casting. It controls molten steel flow and stabilizes steel stream from tundish to mould. For exchange tundish nozzle designed for online replacement, many steel plant operators tend to extend service life to cut refractory cost. However, delayed nozzle exchange will trigger a series of severe operational, quality and safety risks.
1. Accelerated Nozzle Erosion and Molten Steel Leakage Hazard
The inner bore of tundish nozzle suffers continuous scouring from high-temperature molten steel. As the working layer wears away, the residual refractory wall becomes thinner. If replacement is postponed, local erosion or penetration may occur. Molten steel leakage is one of the most dangerous accidents in casting workshop. It can damage casting machine components, burn equipment and cause casualties in serious cases.
Even without immediate breakout, uneven erosion changes the nozzle bore profile. The steel stream will swing and become unstable, which disturbs the flow field inside the mould.
2. Nozzle Clogging and Interrupted Continuous Casting
Worn nozzle has rough inner surface. Alumina inclusions and deoxidation products are easier to adhere and build up on the bore wall. Delayed exchange increases the probability of nozzle clogging. Partial blockage reduces molten steel flow rate, forces casting speed down and breaks the steady casting sequence. Heavy clogging may lead to casting stop. The tundish sequence will be terminated in advance, resulting in yield loss and extra reheating cost.
3. Deteriorated Slab Quality and Higher Rejection Rate
Unstable steel stream caused by worn nozzle directly affects slab quality. Stream deflection induces mould level fluctuation, entraps mould powder and forms slag inclusion, longitudinal cracks and surface defects on cast slab. For high-grade steel, tiny flow disturbance can bring internal inclusion and segregation. These defects cannot be eliminated in subsequent rolling process and lead to finished product rejection.
4. Increased Thermal Shock Risk and Sudden Nozzle Spalling
The residual refractory of worn nozzle has already suffered multiple thermal cycles. Its mechanical strength and thermal shock resistance decline greatly. When molten steel temperature fluctuates, delayed nozzle is prone to crack or spall suddenly. Falling refractory pieces fall into molten steel, pollute steel liquid and may block the flow channel instantly. Spalling fragments also create potential damage to mould and submerged entry nozzle.
5. Higher Overall Operation Cost Instead of Saving Refractory Budget
Some workshops delay replacement to reduce nozzle consumption. This short-sighted measure usually causes greater losses. Unplanned casting shutdown, slab rework, equipment maintenance and accident handling cost far exceed the expense of a new exchange tundish nozzle. Unplanned downtime also disrupts production scheduling and reduces caster utilization rate.
Exchange tundish nozzle adopts online quick-change design to guarantee continuous casting stability. Operators should monitor nozzle erosion condition, steel stream shape and casting parameters in real time. Timely nozzle exchange is essential to prevent safety accidents, reduce slab defects and maximize tundish sequence length. Delaying replacement is not a cost-saving method, but a hidden trouble for steelmaking continuous casting.